Engineering consultancy
Thistledown Green Engineering · Engineering consultancy · Boise, ID
Celine Fennimore is the project manager at Thistledown Green Engineering, a civil engineering consultancy in Boise, Idaho. Her job here is keeping the licences, safety cards and quality records an inspector would ask to see.
Legal and professionalComplianceDimensions4 tables · 6 views · 1 form · 3 dimension sets · 1 dashboard · 1 digest · 1 document · 1 notification · 1 agent
Use this templateAll credentials
Licences and certificates| Licence or certificate | Record number | Kind | Held by | Issued by | Issued | Expires |
|---|---|---|---|---|---|---|
| First aid and CPR - Cavendish-Brae | TG-112 | Rosalind Cavendish-Brae | Mountain West Responder Institute | Sep 7, 2024 | Sep 7, 2026 | |
| Oregon PE licence - Cavendish-Brae | TG-104 | Rosalind Cavendish-Brae | Oregon Engineering Examiners Council | Sep 29, 2024 | Sep 29, 2026 | |
| Rebar locator calibration | TG-119 | — | Cascadia Gauge Services | Oct 6, 2025 | Oct 6, 2026 | |
| Stormwater pollution prevention - Olufsen | TG-127 | Dmitri Olufsen | Northwest Erosion Control Council | Nov 5, 2023 | Nov 4, 2026 | |
| Total station calibration | TG-115 | — | Intermountain Survey Calibration | Nov 8, 2025 | Nov 8, 2026 | |
| First aid and CPR - Olufsen | TG-110 | Dmitri Olufsen | Mountain West Responder Institute | Nov 15, 2024 | Nov 15, 2026 | |
| Erosion control lead - Olufsen | TG-106 | Dmitri Olufsen | Northwest Erosion Control Council | Nov 21, 2023 | Nov 20, 2026 | |
| Workers compensation insurance | TG-122 | — | Bitterroot State Fund | Nov 28, 2025 | Nov 28, 2026 | |
| Washington PE licence - Tellier-Okonjo | TG-102 | Barnaby Tellier-Okonjo | Washington Engineering Registration Board | Dec 3, 2024 | Dec 3, 2026 | |
| Concrete cylinder press calibration | TG-117 | — | Cascadia Gauge Services | Dec 6, 2025 | Dec 6, 2026 | |
| Confined space entry - Olufsen | TG-113 | Dmitri Olufsen | Mountain West Responder Institute | Dec 15, 2025 | Dec 15, 2026 | |
| Professional liability insurance | TG-120 | — | Harborline Professional Underwriters | Jan 22, 2026 | Jan 22, 2027 |
Tables
Licences and certificates
28 sample rows · 9 columnsEvery licence, safety card, calibration and insurance certificate the firm must be able to show an inspector.
| Licence or certificate | Record number | Kind | Held by | Issued by | Issued | Expires |
|---|---|---|---|---|---|---|
| First aid and CPR - Cavendish-Brae | TG-112 | Rosalind Cavendish-Brae | Mountain West Responder Institute | Sep 7, 2024 | Sep 7, 2026 | |
| Oregon PE licence - Cavendish-Brae | TG-104 | Rosalind Cavendish-Brae | Oregon Engineering Examiners Council | Sep 29, 2024 | Sep 29, 2026 | |
| Rebar locator calibration | TG-119 | — | Cascadia Gauge Services | Oct 6, 2025 | Oct 6, 2026 | |
| Stormwater pollution prevention - Olufsen | TG-127 | Dmitri Olufsen | Northwest Erosion Control Council | Nov 5, 2023 | Nov 4, 2026 | |
| Total station calibration | TG-115 | — | Intermountain Survey Calibration | Nov 8, 2025 | Nov 8, 2026 | |
| First aid and CPR - Olufsen | TG-110 | Dmitri Olufsen | Mountain West Responder Institute | Nov 15, 2024 | Nov 15, 2026 | |
| Erosion control lead - Olufsen | TG-106 | Dmitri Olufsen | Northwest Erosion Control Council | Nov 21, 2023 | Nov 20, 2026 | |
| Workers compensation insurance | TG-122 | — | Bitterroot State Fund | Nov 28, 2025 | Nov 28, 2026 | |
| Washington PE licence - Tellier-Okonjo | TG-102 | Barnaby Tellier-Okonjo | Washington Engineering Registration Board | Dec 3, 2024 | Dec 3, 2026 | |
| Concrete cylinder press calibration | TG-117 | — | Cascadia Gauge Services | Dec 6, 2025 | Dec 6, 2026 | |
| Confined space entry - Olufsen | TG-113 | Dmitri Olufsen | Mountain West Responder Institute | Dec 15, 2025 | Dec 15, 2026 | |
| Professional liability insurance | TG-120 | — | Harborline Professional Underwriters | Jan 22, 2026 | Jan 22, 2027 |
Site checks
30 sample rows · 9 columnsEach safety and quality check made on a job site, with what was found and what it cost to fix.
| Check | Project | Kind of check | Checked | Checked by | Result | Findings |
|---|---|---|---|---|---|---|
| Cranebrook compaction under slab | Cranebrook townhomes site utilities | Oct 17, 2026 | Pilar Hargreave | 1 | ||
| Tamarack cylinder break, 7-day set | Tamarack Valley water main upgrade | Oct 16, 2026 | Pilar Hargreave | 0 | ||
| Sawbill closeout walk with the district | Sawbill Lake elementary parking and drainage | Oct 15, 2026 | Rosalind Cavendish-Brae | 0 | ||
| Ridgeback trench shoring, storm line | Ridgeback logistics park grading | Oct 14, 2026 | Dmitri Olufsen | 0 | ||
| Cranebrook fall protection at the stair towers | Cranebrook townhomes site utilities | Oct 12, 2026 | Rosalind Cavendish-Brae | 3 | ||
| Hollyridge daily safety walk | Hollyridge Road culvert replacement | Oct 11, 2026 | Dmitri Olufsen | 0 | ||
| Tamarack erosion control after storm | Tamarack Valley water main upgrade | Oct 9, 2026 | Dmitri Olufsen | 2 | ||
| Ridgeback pad compaction, north cell | Ridgeback logistics park grading | Oct 8, 2026 | Pilar Hargreave | 0 | ||
| Cranebrook traffic control at the entrance | Cranebrook townhomes site utilities | Oct 6, 2026 | Dmitri Olufsen | 1 | ||
| Hollyridge cylinder break, 28-day set | Hollyridge Road culvert replacement | Oct 4, 2026 | Rosalind Cavendish-Brae | 1 | ||
| Marrowfield survey control daily walk | Marrowfield Avenue stormwater retrofit | Oct 3, 2026 | Dmitri Olufsen | 0 | ||
| Tamarack bedding recheck, station 4 | Tamarack Valley water main upgrade | Oct 1, 2026 | Pilar Hargreave | 0 |
Projects
8 sample rows · 9 columnsThe jobs the firm is engineering, with their client, phase and how the site checks are going.
| Project | Client | Site town | Phase | Contract value | Site checks |
|---|---|---|---|---|---|
| Cranebrook townhomes site utilities | Cranebrook Housing Partners | Boise | $2,100,000 | Cranebrook utility trench shoring, Cranebrook storm inlet erosion control, Cranebrook cylinder break, 28-day set, Cranebrook trench rewalk after shoring fix, Cranebrook traffic control at the entrance, Cranebrook fall protection at the stair towers, Cranebrook compaction under slab | |
| Fenwick Bay boat ramp retaining wall | Fenwick Bay Port Commission | Garden City | $1,560,000 | ||
| Hollyridge Road culvert replacement | Elkhorn County Road District | Meridian | $1,840,000 | Hollyridge culvert trench, day 4, Hollyridge cylinder break, 7-day set, Hollyridge fall protection at headwall, Hollyridge detour traffic control, Hollyridge cylinder break, 28-day set, Hollyridge daily safety walk | |
| Lindqvist orchard irrigation reservoir | Lindqvist Family Orchards | Emmett | $910,000 | ||
| Marrowfield Avenue stormwater retrofit | City of Marrowfield Public Works | Caldwell | $1,385,000 | Marrowfield survey control daily walk | |
| Ridgeback logistics park grading | Ridgeback Logistics Park LLC | Kuna | $2,475,000 | Ridgeback pad subgrade compaction, Ridgeback haul road traffic control, Ridgeback detention basin erosion walk, Ridgeback fall protection at loading dock, Ridgeback pad compaction, north cell, Ridgeback trench shoring, storm line | |
| Sawbill Lake elementary parking and drainage | Sawbill Lake School District | Eagle | $720,000 | Sawbill drainage swale final walk, Sawbill parking lot compaction, Sawbill closeout walk with the district | |
| Tamarack Valley water main upgrade | Tamarack Valley Water Authority | Nampa | $3,260,000 | Tamarack main trench shoring, Tamarack bedding compaction, station 4, Tamarack valve vault cylinder break, Tamarack crossing daily safety walk, Tamarack bedding recheck, station 4, Tamarack erosion control after storm, Tamarack cylinder break, 7-day set |
Also included
- Renewals to chase
- Expiry warningTells the project manager a month before a licence, card or certificate runs out.
- Renewal requestThe note that asks the issuer to renew a record before it expires.
Related templates
- Accounting firmSilverbirch Hill CPA4 tables · 5 views · 1 form · 2 dimension sets · 1 dashboard · 1 drill-down · 1 digest · 1 notification · 1 agentDimensions
- Court reporting firmGlenhallow Green Court Reporting4 tables · 4 views · 2 forms · 1 dimension set · 1 digest · 1 checklist · 1 notification · 1 agentChecklists
- Law firmWhitfield-Rao Family Law4 tables · 4 views · 1 form · 1 dashboard · 1 document · 1 notification · 1 stage rule set · 1 agentDocuments and e-sign
- Payroll serviceIronbridge Hill Payroll4 tables · 6 views · 1 form · 2 dimension sets · 1 dashboard · 1 digest · 1 document · 1 notification · 1 agentGoverned columns
- Accounting firmAlbright Tillman CPA Group5 tables · 7 views · 1 form · 2 dimension sets · 1 dashboard · 1 document · 1 notification · 1 stage rule set · 1 agentLinked tables
- Accounting firmVineholt Harbor CPA4 tables · 6 views · 2 forms · 2 dimension sets · 1 portal · 1 dashboard · 1 digest · 1 document · 1 notification · 2 stage rule sets · 1 row action · 1 agentClient portals