Quality lab

Verrowick Surgical Components · Quality lab · Warsaw, IN

Dr. Leah Sorensen runs incoming inspection at Verrowick Surgical Components, an orthopedic implant plant in Warsaw, Indiana, and she uses this to log every lot that arrives, write up what fails, and see that every price, cost and root cause stays behind the people who should read it.

ManufacturingComplianceGoverned columns6 tables · 9 views · 1 form · 2 dimension sets · 1 dashboard · 1 document · 1 notification · 1 stage rule set · 1 agent
Use this template

Disposition board

Incoming lots
Pending inspection5
RL-26-0508BAR-1075Brindlecombe Titanium Bar
RL-26-0502PKG-9014Halvard Sterile Packaging
RL-26-0506SCR-6008Quillon Fastener Works
RL-26-0511FEM-3310Tarnwick Precision Castings
RL-26-0514INS-4400Oakspire Polymers
Accepted26
RL-26-0434BAR-1075Brindlecombe Titanium Bar
RL-26-0449PKG-9014Halvard Sterile Packaging
RL-26-0497TIB-2201Tarnwick Precision Castings
RL-26-0485FEM-3310Tarnwick Precision Castings
RL-26-0482BAR-1075Brindlecombe Titanium Bar
21 more
Accepted under deviation2
RL-26-0461ANO-7700Marrowfield Anodizing
RL-26-0439SCR-6015Quillon Fastener Works
Quarantined4
RL-26-0493TIB-2201Tarnwick Precision Castings
RL-26-0491FEM-3310Tarnwick Precision Castings
RL-26-0499BAR-1120Brindlecombe Titanium Bar
RL-26-0487PKG-9001Halvard Sterile Packaging
Rejected2
RL-26-0471SCR-6008Quillon Fastener Works
RL-26-0475INS-4400Oakspire Polymers

Tables

Incoming lots

39 sample rows · 14 columns

Every lot that arrives at receiving, from the day it is logged to the day inspection accepts it, holds it or sends it back.

LotPartSupplierReceivedQuantityPieces sampledDefects in sample
RL-26-0514INS-4400Oakspire PolymersOct 18, 20264832—
RL-26-0508BAR-1075Brindlecombe Titanium BarOct 16, 202612050—
RL-26-0511FEM-3310Tarnwick Precision CastingsOct 16, 20261632—
RL-26-0499BAR-1120Brindlecombe Titanium BarOct 15, 2026150500
RL-26-0502PKG-9014Halvard Sterile PackagingOct 15, 20266,000315—
RL-26-0506SCR-6008Quillon Fastener WorksOct 15, 20261,500200—
RL-26-0493TIB-2201Tarnwick Precision CastingsOct 14, 202640323
RL-26-0497TIB-2201Tarnwick Precision CastingsOct 14, 202630322
RL-26-0491FEM-3310Tarnwick Precision CastingsOct 13, 202624322
RL-26-0487PKG-9001Halvard Sterile PackagingOct 12, 20265,0003159
RL-26-0485FEM-3310Tarnwick Precision CastingsOct 9, 202624320
RL-26-0482BAR-1075Brindlecombe Titanium BarOct 8, 2026240800

27 more rows

Parts

10 sample rows · 7 columns

The drawing-controlled parts receiving inspects, with the sampling level each one is held to.

Part numberDescriptionDrawing revisionMaterialSampling level (AQL)Price eachSupplier
ANO-7700Anodizing service, Type IIATitanium1.5$6.50Marrowfield Anodizing
BAR-1075Titanium bar stock, 10 mmBTitanium1.0$38.50Brindlecombe Titanium Bar
BAR-1120Titanium bar stock, 20 mmBTitanium1.0$61Brindlecombe Titanium Bar
FEM-3310Femoral component casting, CoCrDCobalt chrome0.65$212Tarnwick Precision Castings
INS-4400UHMWPE insert blankAPolyethylene0.65$54Oakspire Polymers
PKG-9001Sterile barrier pouch, 6 x 12 inFPackaging film2.5$0.84Halvard Sterile Packaging
PKG-9014Peelable lid sheetCPackaging film2.5$0.31Halvard Sterile Packaging
SCR-6008Cortical screw 4.5 x 36 mmEStainless steel1.0$3.20Quillon Fastener Works
SCR-6015Locking screw 3.5 x 24 mmBStainless steel1.0$4.10Quillon Fastener Works
TIB-2201Tibial tray blank, Ti-6Al-4VCTitanium0.65$148Tarnwick Precision Castings

Suppliers

6 sample rows · 12 columns

The approved vendors that ship to receiving, with their audit dates and where each stands.

SupplierQuality contactPhoneEmailApprovalLast auditedNext audit
Brindlecombe Titanium BarOksana Leclerc-Rhodes(412) 555-0122oksana@brindlecombetitanium.netApprovedMar 18, 2026Dec 18, 2026
Halvard Sterile PackagingFenella Brightwater(615) 555-0144fenella@halvardsterilepackaging.netApprovedJan 18, 2026Jan 18, 2027
Marrowfield AnodizingIsadora Pennington-Okafor(317) 555-0166isadora@marrowfieldanodizing.netApprovedMay 18, 2026Feb 18, 2027
Oakspire PolymersDashiell Amari-Voss(508) 555-0133dashiell@oakspirepolymers.netConditionalAug 18, 2026Nov 18, 2026
Quillon Fastener WorksMordecai Haldane-Yu(203) 555-0155mordecai@quillonfastenerworks.netOn probationJul 18, 2026Nov 8, 2026
Tarnwick Precision CastingsWendell Marchbanks(330) 555-0111wendell@tarnwickprecisioncastings.netApprovedJun 18, 2026Mar 18, 2027

Nonconformances

10 sample rows · 14 columns

Every time inspection finds material outside the drawing, from the first finding to the day the fix is proven.

NCR numberLotFindingSeverityFoundFound byDefective pieces found
NCR-26-034RL-26-0499Material certificateMajorOct 16, 2026Leah Sorensen0
NCR-26-033RL-26-0493DimensionalMajorOct 15, 2026Obadiah Whitlock3
NCR-26-032RL-26-0491Surface finishMajorOct 14, 2026Ximena Barros-Lund2
NCR-26-031RL-26-0487Seal strengthCriticalOct 13, 2026Casimir Doyle9
NCR-26-029RL-26-0475ContaminationCriticalOct 9, 2026Ximena Barros-Lund4
NCR-26-027RL-26-0471DimensionalMajorOct 6, 2026Obadiah Whitlock14
NCR-26-024RL-26-0461Surface finishMinorOct 1, 2026Leah Sorensen5
NCR-26-021RL-26-0449PackagingMinorSep 25, 2026Casimir Doyle3
NCR-26-019RL-26-0439DimensionalMinorSep 23, 2026Obadiah Whitlock4
NCR-26-017RL-26-0434LabelingMinorSep 21, 2026Ximena Barros-Lund1

Corrective actions

8 sample rows · 9 columns

The fixes owed after a finding: who owns each, when it is due and when it was shown to work.

ActionNonconformanceOwnerStatusAssignedDueCompleted
CA-26-005NCR-26-019Leah SorensenClosedSep 24, 2026Sep 30, 2026Sep 30, 2026
CA-26-002NCR-26-017Renata IyerClosedSep 22, 2026Oct 1, 2026Sep 29, 2026
CA-26-004NCR-26-019Casimir DoyleClosedSep 24, 2026Oct 5, 2026Oct 1, 2026
CA-26-006NCR-26-021Renata IyerClosedSep 28, 2026Oct 7, 2026Oct 6, 2026
CA-26-008NCR-26-024Renata IyerEffectiveness checkOct 2, 2026Oct 14, 2026Oct 14, 2026
CA-26-011NCR-26-027Renata IyerIn progressOct 7, 2026Oct 26, 2026—
CA-26-013NCR-26-029Renata IyerAssignedOct 12, 2026Oct 29, 2026—
CA-26-012NCR-26-027Leah SorensenIn progressOct 7, 2026Nov 13, 2026—

Also included

  • Finding boardStage rules
  • Supplier corrective action requestDocumentThe letter that goes to a supplier's quality contact when a lot of theirs is written up.
  • Action due soonNotificationReminds the owner three days before a corrective action is due.